Our Portfolio

past projects

The following is a sample of the projects and locations that TCS Electrical has performed.  Detailed descriptions and information will be provided upon request.

Keystone Industrial Park, Throop, PA

69kV to 15kV Substation Yard and Power Control House (2021)

Fort Indiantown Gap ARNG, PA

Advanced Smart Metering (2020 – 2022)

Defense Logistics Agency, Columbus, OH

Advanced Smart Metering for the Main Substation (2020)

UT ANG Roland Wright, Salt Lake City, UT

High Voltage Electrical Survey (2019 – 2020)

Tyndall Air Force Base, Tyndall, FL

– Generator Preventative Maintenance (2020 – 2025)

– Street Lighting and Parking Lot Lighting Upgrades (2021 – 2026)

Wright Patterson Medical Center, Wright-Patterson, OH

Arc Flash Survey and Assessments (2018)

White Wilson Medical Center, Fort Walton Beach, FL

Arc Flash Survey and Assessments, IR Inspections (2018)

National Ground Intelligence Center, Charlottesville, VA

Arc Flash Survey and Assessments (2016 – 2017)

360 Fuel Stores, Panama City Beach, FL

Electrical New Construction (2022-2023)

Cefco Convenience Stores, Panama City, FL

Electrical New Construction (2022-2023)

USDA Facility Campus, Ames, IA

Arc Flash Survey and Assessments (2021-2022)

Northwest Florida Beaches International Airport, Panama City, FL

Circuit Tracing (2023)

Tobyhanna Army Depot, Tobyhanna, PA

– Arc Flash Survey and Assessments, circuit tracing, infrared inspections and panel labeling (2014 – 2021)

– Emergency and Exit Lighting Maintenance program (2016 – 2021)

– Medium Voltage Distribution and Main Substation Preventative Maintenance and Testing Services (2016 – 2021)

– Lightning Protection Inspection and Maintenance Services (2021)

– Generator Replacement and Medium Voltage Switch and Transformer replacements (2017 – 2021)

– Street Lighting Upgrades and New Installs (2020 -2021)

– Industrial Machine Shop Electrical Renovations (2020 – 2021)

Bay County, Panama City, FL

– Military Point AWT Switchgear Installation (2021 – 2024)

– Government Center Generator Installation (2021 – 2023)

– State Attorney Office Generator Installation (2023)

– West Bay Boat Ramp Lighting (2023)

– 9th Street Fuel Island Generator Replacement (2022)

– West End and Bayou George Fire District Lighting (2022)